Concrete Moisture Testing App

Record and analyze test data according to ASTM standards

Project Information

Last calibration date of testing equipment

Slab Information

Ambient Conditions

Relative Humidity Testing (ASTM F2170)

Test # Location Depth (%) Hole Depth (in) Liner Set Liner Duration (hrs) Probe Set RH (%) Temp (°F) Sensor Cal. Date Actions

ASTM F2170 Standard: Internal relative humidity testing of concrete slabs. Tests must be conducted at 40% depth for slabs drying from top only, or 20% depth for slabs drying from top and bottom. Current standard requires minimum 24 hours from sleeve insertion to probe insertion time.